One Tribe Place Remediation

The design scope was divided into three packages: Package 1 consisted of the structural repairs and water infiltration remediation design by WPD & Associates; Package 2 consisted of the Stormwater remediation design by McKinney & Company; Package 3 consisted of the Switchgear Replacement, Fire Pump Relocation and Sprinkler System Upgrade, by Clark Nexsen. Package 3 also included upgrades to life safety and non-code complaint issues in the stairwells and in the 1984 addition.

  • Project Number: 204 – 18100-010
  • Cost: $5,750,000
  • Fund Source: State
  • Renovation/additional GSF:
  • Start Date: May 2019
  • Finish Date: estimated Aug 2020
  • Project Manager: Adam Witkowski
  • Design Team: , ,